Artisan has continuing vertical integration of manufacturing, included Die casting, Painting, Motor assembly, Stamping, Light kit assembly and Fan assembly etc., and continue conducting automatic processing facilities and optimize technical of production to up grade production efficiency.

ERP (Enterprise Resource Program) system was complete conducted in 2002, Based on Lot By Lot model to control purchasing, outsourcing and internal production plan effectively, to reduce the lead time of final delivery to customers. Also utilize the precision data base for management the stock to increase turnover as well as reduce the operating risk.

1.Die-casting
  • Hanger, Switch Housing, Blade iron, Rotors.

2.Painting
  • Wet paint, Powder paint automatic painting.
  • Hand-made finish (specialized finish)
  • Hand painting for various products

3.Motor production
  • Winding of Stators
  • Machining of Rotors
  • Motors assembly and testing

4.Fan Assembly & Packing
  • Light Kits Assembly
  • Main Line Assembly
  • Packing